Guide · Method 5 min read

How to split a task that feels too big

A task feels too big when you cannot see the first thing to do. "Do my taxes" or "clear out the garage" names a result and says nothing about where to begin, so you move it to tomorrow. Splitting the task turns that result into a short list of actions, and the first one is small enough to start today.

Quick answerWrite what done looks like in one sentence. List every action between now and that sentence, and start each line with a verb. Split any step that would take longer than 30 minutes or that you still cannot picture yourself doing. Put the steps in order, write a time estimate next to each one, and do the first step today. You can stop splitting when the first step is something you could begin in the next two minutes.

How do you know a task is too big?

Look for one of these signs:

  • You have moved it to the next day three times.
  • You cannot say what you would do in the first five minutes.
  • It is written as a noun ("taxes", "garage") or it has "and" in the middle.
  • It needs more than one sitting, more than one place, or something you do not have yet.

A task is something you can do in one sitting. Anything larger is a project, and a project sits on a to-do list without moving until you list its parts.

Split it in five steps

  1. Write the finish line. One sentence that says what done looks like: "The return is filed and I have the confirmation email."
  2. List what stands between you and that sentence. Write the actions in any order. Sorting comes later.
  3. Start every line with a verb you can act on. Call, download, measure and email all work. "Research" and "sort out" need a limit, such as "Read three reviews of local accountants."
  4. Split any step over 30 minutes. Do the same for any step that still makes you hesitate when you read it.
  5. Put the steps in order and write minutes next to each. The estimate tells you which step fits the time you have.

Here is "Do my taxes" after the split:

  • Find last year's return (10 minutes)
  • Download the two bank statements (10 minutes)
  • List the forms I am still waiting for (5 minutes)
  • Email my employer for the missing form (5 minutes)
  • Enter my income into the tax software (30 minutes)

The whole job is still there, and the first step now takes ten minutes.

How small should a step be?

Use two tests. First, you can start the step within two minutes without making another decision. Second, you can finish it in one sitting of 5 to 30 minutes. If you read a step and feel the same reluctance you felt about the whole task, split it again. A first step can be as small as "Open the file and type the title."

Stop there. Forty one-minute steps make a list that needs its own upkeep. Split the next three or four steps in detail and leave the later ones rough until you reach them, because what you learn in the early steps usually changes the later ones.

What if you don't know the steps?

Then finding out is the first step. Write it the same way as any other:

  • "Ask Dana how she filed hers."
  • "Search for a moving checklist and copy it."
  • "Decide between the two quotes by Friday."
  • "Waiting for the form from payroll, asked on the 3rd."

A question, a decision and a wait are all steps. Writing the wait down with a date tells you when to ask again.

Four ways to cut a task

  • By stage. Gather, draft, check, send. This suits reports, applications and anything with paperwork.
  • By part. One shelf, one room, one section of the document. This suits physical jobs and long writing.
  • By time. Work on it for 25 minutes, then stop. This suits work with no natural parts, such as studying.
  • By person. Separate what you do from what you need to ask someone else for, and send the requests first so the waiting starts early.

Why is the task still stuck after you split it?

If the steps are clear and you still avoid the first one, size was not the cause. Check three other things:

Where Sukima fits

A sheet of paper does everything in this guide. Sukima writes the first draft of the split for you. When you say or type a goal or a project, the AI files it and adds three to five steps with a time estimate for each. A task that has no steps shows a "Generate steps" button. You can edit any step, delete it or add your own, and the task shows how many steps are done and how many minutes are left.

The steps are a draft. The AI has not seen your garage or your payroll office, so expect to rewrite one or two. The AI features need a paid subscription.

Do it in Sukima
  1. Say or type the big task the way you would tell a friend about it.
  2. Open the task and read its steps. Tap "Generate steps" if there are none.
  3. Rewrite any step that does not fit your situation, then do the first one.

Frequently asked questions

How do you break a big task into smaller steps?+
Write what done looks like in one sentence. List every action between now and that point, start each line with a verb, and split any step that would take longer than 30 minutes. Then do the first step today.
How small should each step be?+
Small enough to start within two minutes without making another decision, and to finish in one sitting of 5 to 30 minutes. If a step still makes you hesitate, split it again.
What if I don't know what the steps are?+
Make finding out the first step. Asking someone who has done it before and copying a checklist are both real steps, and each one can be done today.
How much does Sukima cost?+
Sukima Pro costs $9.99 a month or $49.99 a year. Every feature is in both plans, and you can keep as many tasks and projects as you like.

Keep reading

Your day is full of gaps. Sukima fills them.

Say everything on your mind and get one task back for the time you have.

Download on the App Store Get it on Google Play Open the web app
iOS, Android, and web · Cancel anytime